The Orange County Stormwater Permittees have recently conducted and participated in a number of special studies and investigations which are available below.
If there are any questions regarding the details of a document, or to obtain a hard copy or other alternative formats of the original document, or to have a document read to you, please contact the OC Public Works offices, Monday through Friday, 7 a.m. to 5 p.m. PST, at 2301 N. Glassell St., Orange, CA, 92865. You may also send a message directly or call us at (714) 955-0600.
- Appendix E, Cover
- Appendix E1, BMP Effectiveness and Applicability for Orange County
- Appendix E2, Trash and Debris BMP Evaluation
- Appendix E3, Erosion Control BMP Effectiveness Study
- Appendix E4, Septic System Inventory & Assessment
- Appendix E5, Portable Toilet Pollution Prevention Program
- Appendix E6, Dry Weather Diversion Study
- Appendix E7, BMP Retrofit Study
- Appendix E8, Countywide Spill Control Program (CASC) Report (joint project with the Orange County Sanitation District)
- Erosion Control Best Management Practices - Field Evaluation: The NPDES municipal stormwater permit for the County of Orange and local jurisdiction Permittees (Order No. R8-2002-0010) issued by the Santa Ana Regional Water Quality Control Board in 2002 required the Permittees to submit a proposal for a study to evaluate the effectiveness of a group of selected BMPs for controlling erosion during new development (construction).